BuildCalcENGINEERING
CONCRETE & FOUNDATIONS · 0ms CLIENT MATH

Concrete Slab, Footing & Column Calculator

Estimate cubic yards, cubic meters, pre-mixed 60lb/80lb bag counts, and ready-mix truck loads for driveways, footings, and cylindrical columns.

Feet
Feet
Inches
Patio: 4" · Driveway: 5-6"
Count
10%

Concrete Takeoff Schedule

Includes 10% contractor waste factor

Total Volume
2.72cu. yd
73.33 cu ft
Metric Volume
2.08
Exact metric volume
80 lb Premix Sacks
123Bags
Net: 112 bags
Ready-Mix Truck Loads
1Truck(s)
Based on 10 cu. yd batch truck
Estimated Weight
5.5Tons
11,000 lbs
0ms Client Math EngineStandard Dimensional Tolerances

3D Isometric Concrete Slab Projection

2.72 cu. yd (2.08 m³)
Total Volume2.72 yd³
80 lb Sacks123 Bags
Ready-Mix Truck1 Truck(s)
Total Weight5.5 Tons

Square Feet per Cubic Yard Reference

4-inch Slab81 sq ft
5-inch Slab65 sq ft
6-inch Slab54 sq ft
8-inch Slab40.5 sq ft

Why slab volume is L × W × t, and why a pier is not

Why we divide by 27, and why a cylinder uses π

A rectangular pour is L×W×tL \times W \times t. Thickness is in inches on most tickets, so you divide by 12 to get feet, then divide cubic feet by 27 to get cubic yards — the unit the ready-mix plant sells. That is the only reason 27 appears. It is not a strength number and it is not a waste factor.

A round pier is πr2h\pi r^{2} h. Treating it as length × width over-orders by about 27 percent. An 80 lb bag is taken as 0.60 cubic feet, a 60 lb bag as 0.45 — typical premix yields, not a lab test. Truck loads assume a 10 cubic yard mixer. That is our plant assumption, not a code. Rural drums are often 8 or 9. A 1.2 yard patio is often cheaper in bags than as a short load.

slab yd3=Lft×Wft×tin12×27\text{slab yd}^{3} = \dfrac{L_{\text{ft}} \times W_{\text{ft}} \times t_{\text{in}}}{12 \times 27}
pier yd3=πr2h27(r,h in feet)\text{pier yd}^{3} = \dfrac{\pi r^{2} h}{27} \quad (r,h \text{ in feet})
80 lb bagsgross ft30.60\text{80 lb bags} \approx \dfrac{\text{gross ft}^{3}}{0.60}
60 lb bagsgross ft30.45\text{60 lb bags} \approx \dfrac{\text{gross ft}^{3}}{0.45}
trucks=yd310\text{trucks} = \left\lceil \dfrac{\text{yd}^{3}}{10} \right\rceil

Worked field example

24 × 12 foot driveway, 5 inches thick, plus two 12-inch-diameter piers 4 feet deep. Not the 20 × 10 × 4 slab on the form.

Slab net is 24 × 12 × 5 ÷ 12 = 120 cubic feet, or 4.44 cubic yards. Ten percent subgrade waste takes that to 4.89 yards. Two 12-inch piers are not 1 × 1 × 4. Each is π×(0.5)2×4=3.14\pi \times (0.5)^{2} \times 4 = 3.14 cubic feet; two piers are 6.28 cubic feet (0.23 yard). Adding them as a 2 × 1 × 4 rectangle would have invented an extra 1.7 cubic feet that is not in the hole.

At 80 lb bags the slab alone is already hundreds of sacks. This pour is a truck. Confirm drum size before you treat “1 truck” as 10 yards.

What IRC R506 and ACI 302 actually require

R506 is a residential slab-on-ground chapter: base, vapor retarder, thickness where the table applies. ACI 302 is a placing-and-finishing guide. Neither one sizes your cubic yards. They tell you what has to be under and in the slab after the truck leaves.

Placement rules — volume is still L × W × t

Provision
IRC R506.1
Limit
Slab-on-ground min thickness where the IRC table applies (often 3.5 in)
Failure mode
Ordering 3 inches and calling it a driveway
Provision
IRC R506.2
Limit
Base and vapor retarder as adopted
Failure mode
Counting crushed stone as concrete volume
Provision
ACI 302.1R
Limit
Joint spacing, curing, no cold joints in a single placement
Failure mode
Stopping a truck mid-slab and coming back tomorrow

Where the field usually goes wrong

Putting the gravel base into the concrete volume is the first miss. A 4-inch slab on 4 inches of stone is 4 inches of concrete, not 8. The stone is a different ticket. The second miss is a short load: a 2-yard order on a 10-yard truck often costs more per yard than 5 yards, and the drum may not mix a 1-yard load well.

Cold joints happen when the first truck sets before the second arrives. This calculator does not schedule trucks. A thickened edge is extra concrete at the perimeter, not a thicker slab over the whole driveway — split it into slab plus footing. Cylinders and square piers must not share the same L × W box.

Frequently asked questions

Why divide by 27?

27 cubic feet make a cubic yard. Ready-mix is sold by the yard. The 27 is unit conversion, not waste or strength.

How many 80 lb bags are in a yard?

About 45 at 0.60 cubic feet per sack. A 60 lb sack at 0.45 cubic feet is about 60 per yard. The bag label wins if it differs.

Is a 10-yard truck a code requirement?

No. It is this page’s plant assumption. Rural mixers are often 8 or 9 yards.

Do I include the gravel base in the volume?

No. Base is a separate ticket. R506 wants the base there; it does not add it to the yards.

How do I take off a round pier?

Cylinder mode: πr²h. A 12-inch hole is not a 12 × 12 square.

What is a cold joint and why does it matter?

A hardened edge when a placement stops. ACI 302 wants a continuous pour. Volume math will not warn you.

Does this check compressive strength or rebar?

No. Yards, bags, and trucks only. Bars are on the rebar calculator. psi is the mix you order.